Contents
  1. 0How it fits together
  2. 1Create the project
  3. 2Component Onboarding
  4. 3Indexing of Datapoint lists (for BMS)
  5. 4Data exploration
  6. 5Install the Link
  7. 6Network settings
  8. 7Wired connection to installation components
  9. 8On-site onboarding
  10. 9Optimize
  11. 10Use the platform
Chapter 6 · Network settings

Using an existing installation network

If there is an existing network setup with installation components on site that should remain intact, the Link can be added to the network using its ETH1 port. This allows the Link to communicate with installation components in the network (if the existing configuration allows for it).

If the Link is connected to a router that provides automatic IP address assignment (with DHCP), no further setup is required. If this is not the case (or not preferred), a static IP address can be assigned to the Link. Please contact info@integer.energy to inform us about the preferred settings.