Contents
Chapter 5 · Install the Link
Assemble the Link
In this step you put the antennas on the Link.
It is very important that each antenna goes on the right connector.
-
Find the connectors. The antenna connectors are on the top of the Link. Next to each connector, the Link shows which antenna goes there: GSM, GSM and LoRa.
-
Put on the GSM antennas. Screw the two GSM antennas onto the two connectors marked GSM.
-
Put on the LoRaWAN antenna. Screw the LoRaWAN antenna onto the connector marked LoRa.
