Contents
  1. 0How it fits together
  2. 1Create the project
  3. 2Component Onboarding
  4. 3Indexing of Datapoint lists (for BMS)
  5. 4Data exploration
  6. 5Install the Link
  7. 6Network settings
  8. 7Wired connection to installation components
  9. 8On-site onboarding
  10. 9Optimize
  11. 10Use the platform
Chapter 5 · Install the Link

Assemble the Link

In this step you put the antennas on the Link.

It is very important that each antenna goes on the right connector.

  1. Find the connectors. The antenna connectors are on the top of the Link. Next to each connector, the Link shows which antenna goes there: GSM, GSM and LoRa.

  2. Put on the GSM antennas. Screw the two GSM antennas onto the two connectors marked GSM.

  3. Put on the LoRaWAN antenna. Screw the LoRaWAN antenna onto the connector marked LoRa.